GRUPO ABERDEEN
Grupo Aberdeen · Home
← Grupo Aberdeen

PEOPLE · EQUIPMENT · PROJECT DELIVERY

Technology
on site.

The crews, installation work and equipment behind our projects. See Grupo Aberdeen at work on site.

Explore our project services
A crew backfilling the excavation around a treatment unit.
A crew installing a treatment unit and backfilling the excavation around it.

FUJICLEAN · PROJECTS IN EL SALVADOR

Real installations.
Different scales.

Three examples of field installation, with different units and site conditions.

FujiClean CE21 system on a concrete base during installation

FUJICLEAN · INSTALLATION IN PROGRESS

CE21 · above ground level.

Above-ground installation of a FujiClean CE21 system in El Salvador. Work is ongoing; this is not presented as a completed installation.

Explore the FujiClean CE range
FujiClean CE30 unit during installation preparation
FUJICLEAN · TOURISM INSTALLATION

CE30 · another project scale.

Equipment during preparation for an installation at a tourism facility in El Salvador.

FujiClean CE5 system during installation, with blockwork and pipework visible
FUJICLEAN · INSTALLATION IN PROGRESS

CE5 · installation in progress.

Installation of a FujiClean CE5 system in El Salvador. The photograph shows the unit, pipework and civil works in progress.

Explore the CE5 model

Explore more installations and field work.

More projects on Instagram

GRUPO ABERDEEN INSTALLATIONS · EL SALVADOR

Businesses. Healthcare.
Accommodation and institutions.

Our wastewater treatment experience spans businesses, public and private hospitals, health centres, accommodation and institutional facilities.

Business and commercial sites.

Small and medium-sized businesses account for 70% of our commercial business. For each business, flow, wastewater composition and the discharge route guide treatment selection.

Public and private hospitals.

Experience in public hospitals, private hospitals and at least 20 additional health centres and clinics. In public healthcare, we have worked with systems discharging to sewers or receiving waters, depending on the project.

Accommodation.

Wastewater treatment for accommodation and short-stay rental properties. Occupancy and its variations are key inputs for assessing flow and planning operation.

Institutional facilities.

Treatment systems for institutional facilities and shared spaces. Design considers the population served, usage patterns and access for inspection and maintenance.

Developers and water reuse.

The intended water use guides the design: treatment, additional stages, quality testing and applicable authorizations. Assessing these requirements early helps establish whether reuse is feasible for the development.

Assess the feasibility of water reuse

Technology, model and scope are specific to each project. This sector overview does not attribute one brand to every installation.

THE WORK BEHIND EACH SYSTEM

Install. Integrate.
Follow through.

Equipment selection is one part of a project. Handling, civil works and follow-up connect the technology with site conditions.

Treatment unit suspended with slings during an on-site installation operation
Positioning a treatment unit.

01 · INSTALLATION

Installation takes coordination.

Site access, handling space and equipment position need to be considered before installation. Coordinating these conditions helps connect equipment supply with work on site.

The scope is defined for each job: handling, positioning and connections according to the equipment and project design.

Plan the installation
Treatment tank with three green lids within blockwork
Equipment integrated within blockwork.

02 · CIVIL WORKS

Civil works integrate the system.

Equipment needs infrastructure suited to the site and project. Space, connections and access to inspection openings are part of that coordination.

Grupo Aberdeen can combine civil works, supply and installation within an agreed scope. The configuration shown in the photograph belongs to that site; it is not a universal solution.

Explore the turnkey scope
ATB control unit and visible connections within its enclosure
Detail of an ATB control unit.

03 · OPERATION AND FOLLOW-UP

The work continues during operation.

Controls are part of system monitoring. Maintenance includes checking the indications and components relevant to the equipment and diagnosis.

Follow-up combines inspection, operating records and, when appropriate, sampling and analysis.

Plan maintenance Connect follow-up with LAMA

EACH PROJECT DEFINES ITS DISCHARGE ROUTE

The discharge route needs assessment too.

This detail documents a soakaway associated with a CE5 system. It does not mean infiltration is suitable for every installation: the ground, treated water and applicable requirements must be assessed for each project.

Review the water discharge route
Soakaway pit with a discharge pipe and masonry lining.
FujiClean · discharge

Discharge to a soakaway

Absorption well receiving effluent from the project’s FujiClean CE5 system.

THE NEXT STEP

Let’s talk about
your project.

Tell us your business activity, location and what you need to resolve. For an existing system, include the model and the issue you have noticed. For a new system, share its intended use and any known flow rate or capacity.

Contact Grupo Aberdeen
WhatsApp