GRUPO ABERDEEN
Grupo Aberdeen · Home
← Grupo Aberdeen

ENVIRONMENTAL CONSULTING AND SUSTAINABILITY

Water and waste.
Your next steps,
clearly defined.

A business's water use, discharges and waste are part of that environment. We review your operations to identify the applicable requirements and organize the actions you need to take.

Let’s discuss your project
View of San Salvador with buildings, vegetation and a mountain in the background
San Salvador. Urban activity and the natural environment share the same landscape.

PRACTICAL SUPPORT FOR YOUR BUSINESS

Four authorities.
One clearly defined path.

Registration, authorization and permitting are separate procedures. We review your business activity, location and project scope to identify the responsible authority and the requirements that apply.

01 / WATERASA

Salvadoran Water Authority

Water sources, use
and discharges.

We help organize records for your water source, water use authorization and wastewater discharge. Each procedure is reviewed separately.

Wells and water withdrawal sources +
  • Identify the well or spring, its location and how the water is used.
  • Review the source registration and available background information.
  • Organize documentation for water use and withdrawal authorization, where applicable.

Registering a water source does not authorize withdrawal. If the project requires exploration for water, the applicable exploration permit is reviewed first.

Water source registration Water use and withdrawal
Discharge permit +
  • Review the origin, flow rate and destination of the discharge.
  • Compile test results, operating records and background information on the wastewater treatment facility.
  • Prepare technical information for the discharge permit, where applicable.

The appropriate procedure depends on whether water enters a receiving environment or a sewer, or is intended for reuse. A discharge permit does not replace the environmental permit or the treatment facility’s reporting obligations to MARN.

Discharge permit
FOR YOUR COMPANY

A clear application process, organized documents and follow-up on the authority’s review comments.

02 / ENVIRONMENTMARN

Ministry of Environment and Natural Resources

Environmental management
and treatment system monitoring.

We review environmental obligations, management programs and monitoring records, bringing together operational information, laboratory results and the required reports.

Environmental permits and ongoing obligations +
  • Review the activity, location and existing permits.
  • Identify commitments, environmental management measures and unresolved review comments.
  • Organize the application file and determine which authority has jurisdiction: MARN, DOT or ANDRES, depending on the project.

Not every new project is handled by MARN. The correct procedure must be checked against each authority’s current jurisdiction and the scope of the proposed work.

MARN information
Treatment facility sampling and reporting +
  • Identify sampling points, flow rates, required parameters and monitoring frequencies.
  • Prepare sampling schedules and results for submission through SEA.
  • Assess results against RTS 13.05.01:24 and the conditions that apply to the project.

For regulatory use, we verify the laboratory responsible and whether its accreditation covers the required work. A test result does not certify the company as a whole.

Treatment facility sampling in SEA Explore LAMA’s monitoring programs and parameters
FOR YOUR COMPANY

A monitoring program, technical evidence and a follow-up schedule.

03 / WASTEANDRES

National Solid Waste Authority

Waste management,
manuals and traceability.

We translate waste management requirements into practical steps for your operations: identifying, separating and storing waste, transferring it to waste service providers and keeping records.

Manuals and operational controls +
  • Identify and characterize waste types, handling methods and destinations.
  • Review waste separation, storage and the documentation of authorized waste service providers.
  • Prepare or update the required manual and its monitoring records.

ANDRES offers a process for reviewing and approving waste management manuals. We assess which manual is appropriate for the activity and its obligations.

Waste service providers, projects and records +
  • For waste service providers: prepare the information needed for the applicable authorization.
  • For waste management projects: prepare technical documentation appropriate to the project scope.
  • Compile records and supporting evidence to meet ANDRES requirements and those of its information system, where applicable.

Requirements vary by company. The existence of the information system does not, by itself, require immediate registration or establish a deadline for every business.

ANDRES services Waste legislation
FOR YOUR COMPANY

A manual and action plan, operational controls and traceable records.

04 / PROJECTSDOT

Directorate of Land Use Planning and Construction

Environmental requirements
for construction.

We organize environmental, water and sanitation information for projects under DOT jurisdiction, working with the professionals responsible for the design and required studies.

Project information +
  • Review the location, activity, project stage and existing records to identify the appropriate procedure.
  • Determine how water supply, wastewater treatment and waste management fit into the project scope.
  • Coordinate environmental documentation, required studies and responses to review comments with the responsible project team.

Environmental assessment forms part of the integrated process established by DOT regulations. The studies and documents required depend on the project’s characteristics and regulatory classification.

Jurisdiction and professional qualifications +

Jurisdiction depends on the project’s type and location, and the responsibilities of DOT, OPAMSS, MARN, ASA, ANDRES and any other relevant bodies. A single authority should not be assumed to handle every permit.

Before agreeing on how the work will be carried out, we verify the current registration, technical qualifications and other requirements of the professionals who must sign plans, studies or documents. Environmental coordination does not replace design work or sign-off by an appropriately qualified and authorized professional.

DOT regulations (PDF) Notice of regulatory jurisdiction in SEA
FOR YOUR COMPANY

A coordination plan, clearly identified requirements and an organized technical file.

We identify the requirements that apply based on the activity, location, water source, discharge destination and waste types. The scope and responsible professionals are agreed for each project. The relevant authority makes the final decision; permit approval is not guaranteed.

HOW WE CAN SUPPORT YOU

From assessment
to clear priorities.

The scope, responsible professionals and deliverables are agreed upon for each project.

01 / CONSULTING AREA

Compliance and environmental management

Clarify obligations. Prioritize action.

Review applicable obligations, environmental management programs and compliance evidence. Use the findings to address review comments, prepare for audits and plan improvements.

SCOPE TO BE DEFINEDAssessment, action plan and follow-up.

02 / CONSULTING AREA

Water, discharges and treatment systems

Use monitoring to guide operations.

Develop sampling programs, interpret results and assess treatment performance. Prepare information for the applications and reports required for the activity and discharge destination.

SCOPE TO BE DEFINEDA monitoring plan and operational recommendations.

03 / CONSULTING AREA

Environmental monitoring with LAMA

Data to support decisions.

Monitor and assess water, air, soil and emissions within the agreed project scope. Interpret results against the project objectives and applicable technical references.

SCOPE TO BE DEFINEDA defined monitoring scope and technical recommendations.

04 / CONSULTING AREA

Cleaner production and training

Make improvements at the source.

Identify opportunities to reduce resource use, prevent pollution and improve processes. Provide practical training so your team can implement and monitor the changes.

SCOPE TO BE DEFINEDImprovement opportunities and team training.

FROM REQUIREMENTS TO OPERATIONS

Clear priorities
for your business.

Permits, monitoring and waste management are connected to your day-to-day operations. We review the available information to define the actions, responsibilities and deliverables for our support.

Prepare my enquiry

John McCormack co-founded Futures Hub 4 Sustainability. Explore its work on sustainability and possible futures.

Explore FH4S

GETTING STARTED

A well-prepared
conversation.

The information available helps us define the scope and next step.

Have these details ready.

  • Business activity and project location.
  • Available permits and reports.
  • The issue you want to address.
Prepare my enquiry
Regulatory context and official sources +

References reviewed in November 2026. The requirements that apply depend on the activity, permits, facility and discharge destination. Always check the current official version.

MARN cites RTS 13.05.01:24 in its current guidance and moved annual sampling schedules for wastewater treatment facilities to SEA in February 2026. ASA publishes procedures for registering water sources, authorizing water use and obtaining discharge permits. ANDRES maintains the current waste regulatory framework. DOT oversees urban development and construction projects within its jurisdiction, with regulations covering environmental assessment and the qualifications of responsible professionals.

This information is intended to support a technical discussion. It is not regulatory approval and does not guarantee permits, savings or results. National standards and policies do not, by themselves, require every company to obtain ESG certification or publish ESG reports.

THE NEXT STEP

Let’s talk about
your project.

Tell us your business activity, location and what you need to resolve. For an existing system, include the model and the issue you have noticed. For a new system, share its intended use and any known flow rate or capacity.

Contact Grupo Aberdeen
WhatsApp